New West Damietta Power Plant (New West Damietta Power Plant Phase I Unit I) is equipped with GE Power PG 9171E gas turbine.
The phase consists of 1 gas turbine with 125MW nameplate capacity.New West Damietta Power Plant (New West Damietta Power Plant Phase I Unit II) is equipped with GE Power PG 9171E gas turbine.
The phase consists of 1 gas turbine with 125MW nameplate capacity.New West Damietta Power Plant (New West Damietta Power Plant Phase II) is equipped with GE Power D200 steam turbine.
The phase consists of 1 steam turbine with 250MW nameplate capacity